Project: South Yarmouth LNG

Client
National Grid

Location

Scope of Work
National Grid is exploring updating the existing South Yarmouth LNG facility – replacing the existing storage tank and liquefaction system – and has requested CH∙IV to perform a preliminary siting analysis for the facility following current DOT PHMSA methodology for determining exclusion zones and demonstrate compliance with 49 CFR Part 193 siting requirements. To support the siting analysis, CH∙IV also prepared a conceptual level engineering design including a basis of design, plot plan, process flow diagram, and equipment list.

Contact us at 410-691-9640 for more information.

Email us

Our Office Locations