Energía Costa Azul LNG Terminal

Energía Costa Azul LNG Terminal

CLIENT:
Black & Veatch
LOCATION:
Mexico
SCOPE:
Commissioning management assistance including directing the repair of hundreds of cryogenic valves. CH·IV wrote the procedure for and directed the facility dry out. CH·IV also provided oversight of the cooldown of the LNG tanks, and assisted in directing the preliminary and final terminal cooldown and start-up.
Dahej Jetty Expansion Project

Dahej Jetty Expansion Project

CLIENT:
Petronet LNG
LOCATION:
India
SCOPE:
Developed a detailed feasibility study and cost estimate for an expansion project to accommodate increased terminal capacity from 5 MTPA to more than 10 MTPA. Follow on work included preparation of topside FEED, a comprehensive bid package and RFP to allow Petronet to award contracts to carry out the detailed design, construction and startup of the expanded facilities.
LNG Production and Export Project

LNG Production and Export Project

CLIENT:
Liquid Niugini Gas
LOCATION:
Papua New Guinea
SCOPE:
Study to evaluate various piping and LNG storage configurations for the production and export of LNG from the facility. The study determined the impact of various configurations and pipe insulation options on the amount of generated boiloff gas (BOG). The study also included cost estimates for several pipeline systems, comparison of available options and proposed methods of BOG management.
Adriatic LNG Receiving Terminal

Adriatic LNG Receiving Terminal

CLIENT:
Adriatic LNG
LOCATION:
Adriatic Sea
SCOPE:
Technical services commencing with a “Cold Eyes Review” of the facility design, review of facility start-up procedures and start-up technical support for the world’s first gravity-based LNG import terminal.
Cove Point LNG Liquefaction Expansion Project

Cove Point LNG Liquefaction Expansion Project

CLIENT:
Dominion Cove
LOCATION:
USA, Maryland
SCOPE:
Owners engineer role following initial support in the development of Resource Reports 11 and 13 and associated 49 CFR Part 193 requirements for the liquefaction proposal
Lake Charles Liquefaction Project

Lake Charles Liquefaction Project

CLIENT:
Trunkline LNG
LOCATION:
USA, Louisiana
SCOPE:
Development support of FERC resource reports for Trunkline LNG’s 15 MTPA Liquefaction Facility.
Tacoma Fuels Project LNG Facility

Tacoma Fuels Project LNG Facility

CLIENT:
Puget Sound Energy
LOCATION:
USA, Washington State
SCOPE:
Provision of permitting, site feasibility and selection and early engineering for this innovative 0.2 MTPA (scalable) liquefaction facility, purpose built to provide LNG as marine vessel bunkers.
LNG Export Facility

LNG Export Facility

CLIENT:
Oregon LNG
LOCATION:
USA, Northwest Oregon
SCOPE:
FEED for the 9 MTPA LNG production and export facility for Oregon LNG. The FEED was submitted in a permit application to construct the terminal.
Spring Gardens LNG Peakshaving Facility

Spring Gardens LNG Peakshaving Facility

CLIENT:
Baltimore Gas & Electric
LOCATION:
USA, Maryland
SCOPE:
Providing on-site engineering support ranging from oversight of cold box replacement start-up, operating procedure updating, hazard mitigation studies and hazard exclusion zone calculations.
Natural Gas Liquefier Feasibility Study

Natural Gas Liquefier Feasibility Study

CLIENT:
Confidential
LOCATION:
USA, New England
SCOPE:
Study to evaluate a series of options to replace total historical LNG peakshaving liquefaction capacity at four different locations. The study considered a variety of liquefaction capacities, liquefaction technologies and electric or gas turbine drive. The study also considered siting criteria, permitting limitations and LNG trucking access. Capital and operations and maintenance cost estimates were generated for 16 different cases.
Thorold LNG Production and Truck-Out Facility

Thorold LNG Production and Truck-Out Facility

CLIENT:
Northeast Midstream of Toronto
LOCATION:
Canada, Thorold, Ontario
SCOPE:
Preliminary diligence to be used to assist the client to market the project to new equity investors and refine their views on the high level technical risks of the project. The project is a greenfield 180,000 gallon per day LNG production storage and truck-out facility.
Waterbury LNG Facility

Waterbury LNG Facility

CLIENT:
State of Connecticut
LOCATION:
USA, Central Connecticut
SCOPE:
Engineering services to assure regulatory compliance. This included review and oversight of the design, safety and operational aspects of the facility, encompassing: RFP bid packages, EPC scope of work, design calculations, detailed drawings, procedures and manuals, project specifications and construction.
PT South Sulawesi LNG Facility

PT South Sulawesi LNG Facility

CLIENT:
Energy World Corporation
LOCATION:
Indonesia
SCOPE:
Front end engineering design (FEED) for the balance of plant for this 2.0 (expandable to 5.0) MTPA gas liquefaction and marine export facility.
Freeport LNG Project

Freeport LNG Project

CLIENT:
Freeport LNG
LOCATION:
USA, Texas
SCOPE:
Pre-FEED services investigating the design and regulatory requirements for converting the existing LNG import terminal to a world class LNG production and export facility. This was followed by the award of the Balance of Plant FEED for the 13.4 MPTA liquefaction facility.
Magnolia LNG Liquefaction FEED

Magnolia LNG Liquefaction FEED

CLIENT:
LNG Limited
LOCATION:
USA, Louisiana
SCOPE:
Front end engineering design (FEED) and compilation of the Federal Energy Regulatory Commission (FERC) Resource Report 11 and 13 for the proposed 8 MTPA LNG production and export facility. This included siting analysis (including vapor dispersion and thermal radiation exclusion zones, overpressure modeling, and toxicity modeling), NFPA 59A Fire Protection Evaluation, hazard detection, control, firewater system design details, and other required documentation. CH·IV also oversaw the preparation of the LNG tank design, marine facilities design and geotechnical analysis.
LNG Import Terminal

LNG Import Terminal

CLIENT:
EcoEléctrica
LOCATION:
Puerto Rico
SCOPE:
Owner’s engineering support including preparation of FEED for terminal expansion and LNG trailer loading station, procurement specifications for major equipment, EPC contractor scope of work, and oversight of detailed design.